The changes from the April updates include (but are not limited to):
07/05/2024
APP Manager
- [Correction]
Several packages from the Chocolatey library no longer had icons, descriptions, versions, etc., and did not allow for proper tracking in the automatic application deployment management.
Adjustment and standardization of package installation logs.
Assist
- [Correction]
Correction of freezes and slowdowns as well as the NaN error that remained displayed on the screen.
- [Addition]
The password field in the elevation of rights feature is now mandatory.
15/05/2024
APP MANAGER
- [Correction]
The loading of applications is once again fully operational. The infinite scroll to load all applications from the Chocolatey library works.
Assist
- [Correction]
The domain is now functional in the identification field of the elevation of rights feature.